Holographics — Movie & Digital Productions

Blank wall to videowall

From blank wall to videowall. A white wall, a paper template, five brackets aligned to the millimetre: the sequence of a videowall installation, from bare wall to a row of lit displays.

Work

From blank wall to videowall
Type
Narrow-bezel videowall on pop-out brackets
Stages
Marking out, template, brackets, displays, testing
Delivered
Room ready to use, with workstations

Step by step, in pictures

The bare wall with fixing points marked
1/8 The bare wall with fixing points marked

How we did it

  1. Marking out

    The wall is measured and fixing points marked, checking level and flatness.

  2. Template

    A full-size paper template checks position and alignment before drilling.

  3. Brackets

    Pop-out brackets, one per display, so each panel can be pulled forward for front service.

  4. Displays

    Narrow-bezel panels are hung and aligned edge to edge.

  5. Testing

    Signal, colour calibration and test content; then the workstations in front.

Bring us the context. The constraints. Even the mess.

Finding the way is our job.

Tell us the problemor write to holographics.it@gmail.com